Gaga Ball Pit Construction Project of Fall 2021
In Session October 21st, 2021
Sponsored by Chairmen Willis, Crowder, and Allen, as well as Senators Eaton, Naranjo, and Shaughnessy
Requested by ΑΩ President Bergman
A Bill
Relating to the purchase of building materials for the construction of a Gaga Ball Pit to be placed into the EMS system to be available for any person or event to use on campus.
Be it enacted by the LeTourneau University Student Senate.
Short Title
Section A.
This act may be referred to as the "Gaga Ball Pit Construction Project of Fall 2021"
Appropriations
Section B.
1. A total of four hundred ($400.00) dollars will be appropriated from the Senate General Fund for the purchase of construction materials, mainly wood board and beams.
2. All funds not used in this manner will be reverted back to the Senate General Fund.
Effective Date
Section C.
This act shall become effective upon passage.
Stipulations
Section D.
1. The Gaga Ball Pit will be 19 ft wide, from side to side (perpendicular) and it will be around 3 ft high.
2. Anyone willing to volunteer their time and service is welcome to assist in the construction, but the majority of the labor will come free of charge from ΑΩ members.
Explanations and Reasoning
Section E.
LeTourneau University does not currently have a Gaga Ball Pit. Why do we need one? Everybody likes them. ΑΩ President Bergman posted a survey on the buzz app a semester or two ago asking for feedback from LETU students about whether they would be interested in using a Gaga Ball pit if one were to be built on campus. The survey received 52 responses, 95% of which were overwhelmingly positive and showed interest in using said pit if it were to be built.
“If you build it, they will come.”
Section F. Appendix
Figure 1: CAD Assembly Picture